Guayaquil Construction Registration

According to article 5° of the ROTIC (Regulation of the Compulsory Social Security for construction workers by Work or Time Determined), the employers dedicated to the construction industry must make the registration of work, of each of these, before the IMSS (Mexican Institute of Social Security). Specifically, in the SIROC portal that said institute enabled to do all the procedures online.

Ready! In the case of steps 6, 7 and 8, do not worry if the dates change, the amount is increased or the surface area may vary during construction. You will be able to modify this information later on the SIROC portal, by means of a construction incident notice. However, it is important to note that this data can be changed a maximum of three times.

What is a construction record?

The registration of a type B construction permit is the procedure to build, expand, repair or modify a construction or facility for non-housing or mixed use of up to 5,000 m2 or up to 10,000 m2 for housing use.

What is the work registration number?

-Work registration number: This is a unique alphanumeric code that identifies the type of work, its location and the work to be carried out.

How to register a construction site?

Steps to register the work

Choose the type of employer that will perform the registration: contractor, subcontractor or intermediary. Enter the address where the work is located (you must know the zip code and neighborhood) Specify street, number and other relevant information about the location.

Read more  Can I print my VAT certificate online?

How much does a construction permit in guayaquil cost?

Central Office: Central phone 809-565-2811, Ext. 2212, 4093 and 3154 North Cibao Regional Office: Central phone 809-582-2121, Ext. 4055, 1693 and 2212 Northeast Cibao Regional Office: Central Telephone 809-588-2270, Ext. 224 and 225 South Cibao Regional Office: Central Telephone 809-537-0044

Cost: RD$6,000.00 Hours of operation: Monday to Friday from 8:00 AM to 5:00 PM Delivery time: 45 working days Service delivery channel: Online Access to the Service: Access the service here.

For all types of construction: 1. Access the Plan Processing Portal and register if you have not done so previously. 2. Fill out the Construction License Application Form and attach the required documentation. 3. Make corrections if required by the technical areas. 4. Wait for the approvals of all technical areas.

This information is also available at the Government Contact Center (GCC). If you wish to speak to a person, you can call free of charge from anywhere in the country and from any telephone belonging to any telephone company by dialing *462 (*GOB) Monday through Friday from 8:00 AM to 5:00 PM. For more information about the Governmental Contact Center you can visit this link

How to register a construction before the IMSS?

It can be submitted in person or online. At the IMSS Subdelegation or administrative office where the construction site is located, Monday through Friday from 08:00 to 15:30 hours.

Who should submit the Siroc?

To those individuals or legal entities that provide subcontracting services, who must have their registration before the STPS established in Article 15 of the Federal Labor Law.

Read more  How long does it take to qualify as a farrier?

What happens if I do not register a construction site with the IMSS?

Failure to register your construction site could result in a fine and if you are in the construction industry you should be familiar with the SIROC employer obligation. This is very common in the construction industry where millions of irregularities will arise daily.

National registry of civil construction workers

In the case of gasoline, diesel and/or carburation service stations, they must present the evaluation of the Environmental Impact Statement or respective risk study, civil protection report and urban compatibility study, all with a positive resolution.

In person: Go to the Dirección de Desarrollo Urbano y Ordenamiento Territorial, located in the Administrative Building on Boulevard Paseo de los Conspiradores, No. 130, San Miguel de Allende, Guanajuato, Zip Code 37748. With a schedule of attention: 08:00 to 14:30 hours from Monday to Friday. Note: Information valid during 2021.

What is the Siroc Works Registry?

The Integral System for the Registration of Construction Works (SIROC) is an application developed by the IMSS. … SIROC is mandatory as of September 1, 2017 for all employers engaged in the construction activity, thus replacing the previous application.

How to register a work in the SUA?

1-Registering a work in the SUA: Through 3 options the user will be able to enter the pertinent data for the registration of a work. The way to enter the information can be done through: “Individual registration”, “Selective registration” and “Import registration data”.

How much does it cost to register a construction site with the IMSS?

– The approximate cost per square meter is between 9 and 12% of the contract value, depending on the type of house.

Regularization of constructions in guayaquil

Since the first implementation of the SIT, a geo-referenced database has been created, which has allowed us to face new projects and challenges in this third version, presenting the user with integrated and consolidated information for consultation and use related to a property (LUSU primer, risk zone and its restrictions), working with online procedures and digital documentation, as well as a set of tools for document verification, follow-up and consultation of procedures. Within this framework, the online processing of construction permits was developed. You must perform the following steps to complete the online process.

Read more  Where do I find VAT registration number?

You must identify the property you wish to obtain a construction permit for, it will show you the technical data of the property so that you can verify the number of floors you can build and the corresponding LUSU booklet, as well as other information related to your property.

The delegated architect will receive by mail a web page where he will register the construction parameters to start the Building Permit process and will attach the project in digital format (.DWG).

By Rachel Robison

Rachel Robison is a blogger who collects information on court filings and notices.